Tuesday, July 19, 2022

Summer 2022 layout construction update

Over the past few months both the 3-1/2 foot section with the east portals of the Palisade tunnels and the 8 foot Carlin section have been completed to the point that they were ready to be installed into the layout.  So more photo backdrops were ordered and installed and about 2 weeks ago the smaller section was put in and the connections to the lift bridge were re-done.  After everything was tested then the larger section was added.  This has been done within the past week and work is now going on to install connecting tracks, wiring, and fascia.  Having the air conditioner has made it possible for me to spend more time working in the train room during the summer months.




























No comments:

Post a Comment