Sunday, February 2, 2020

Progress on the scenery window box

Work continues on the scenery window box in the Palisade Canyon section of the layout.  To round out those sharp corners in the box I installed some plastic paneling attaching it with Liquid Nails adhesive.
The hillside was built up using pieces of insulation board to create a continuation of the canyon wall.  Liquid Nails adhesive was also used to secure the insulation board.
Then the insulation board was covered with plaster cloth.  The rock formations along the top are now being added and the plastic panel sky board got it first coat of paint.

2 comments:

  1. Replies
    1. Thanks Rod. This has turned out to be a fun little side project, sort of like building a small module.

      Delete