Bench work for Wesso

Here is an overall view of the Wesso section bench work.  It is 24 inches deep at the widest parts and about 80 inches long.

I built this section of bench work very much like a module for a portable layout.  The side railings  beams are 1/2 inch plywood and the deck is 1/4 inch.

The path for the rail lines was raised above the surface with blocks of 5/8 inch plywood.  This section is set 5/8 inch lower than the adjoining section so the level for the tracks on both is the same.

Land contours will be done with insulation board but I wanted solid wood under the road bed.
A river bed was cut into the flat surface were a pair of bridges will carry both the east and west bound lines over this first of several crossings of the Humboldt river.

As I did when working on the yard, this section will be resting on wall ledgers so it can be easily removed to work on.