Friday, September 18, 2020

Sparks Yard rebuild - general update # 1

This yard rebuild project started around September 1st.  My plan is to push on with this through the fall and will be posting regular general updates along with posts on specific items as needed.  This is the first general update.

On the entry end next to the helix all 5 of the turnouts and Tortoise motors were removed.  Enough of the track and road bed was removed so a smooth transition from old and new could be achieved.   3 new Peco turnouts were assembled into a yard ladder on the bench and then installed and integrated into 4 of the existing yard tracks.  The turnout in the upper left corner will create the return loop and still needs to be installed.

At the other end (the loop end) of the yard the 5th track was realigned to be a single siding off of the return track.  In this photo the remnants of the old road bed can be seen.  The remaining 4 tracks have been cut off at this end of the yard and this yard ladder will be worked on when the entry end is finished.


No comments:

Post a Comment