The Western Pacific track will exit the west end of the layout at the US 95 / Melarkey
Street overpass in Winneumcca and then enter the helix. This overpass is a two lane road.
On the prototype this bridge is about
half a mile away from the I-80 overpass that the Southern Pacific track
passes under but with the compression necessary in the model world it is
only about 700 scale feet away. Also I am representing the line as a single track where as in the real location it has become 2 tracks plus a siding.
The overpass was made from leftover parts from a Rix Products kit. I have used and re-used several of these kits on other layouts. The clever design of these kits make them easy to modify to fit almost any situation. While primarily an HO manufacturer, Rix Products does make several other N scale injection molded kits.
To see more of their N Scale kit products visit the Rix Products Inc. website.
This company also makes modern concrete barriers as a separate set
and I have ordered some of those for the Interstate highway.
Here is the small bridge assembly I put together to represent the Melarkey street overpass. I used extra roadway sections to extend the road onto the top of the hill.
One pier was assembled and it's height adjusted to match the retaining wall on the hill.
Here is the bridge temporarily set in place. The short lengths of round column seen the the prior photo fit into holes drilled in the bench work.
There is still much left to be done on this scene, the biggest part being the creation of a back drop.
That's gonna look great Brad!
ReplyDeleteThanks Alan
Delete