1 year since construction started

It's been just about one year since construction started on the layout.  Here's what got done on the layout in that one year.

  • Staging yard bench work built, track laid, wiring done, and yard installed.
  • 15 feet of LED layout lighting installed.
  • Yard control panels started and one completed.
  • Started the helix.

Today I built the little bridge section seen in this photo that connects the upper level staging yard to the outer loop of the helix.  This section will support the turnout that creates the reverse loop for the upper yard.  Helix progress has been stalled until this is done.  It will be the last of 16 code 80 turnouts associated with the staging yards.

The helix design has been working out really well so far.  The lower level yard is fully installed and various types of trains that been run up and down the helix to iron things out.  Turnouts on the lower yard have to be moved by hand as the control system for that part is not done yet.

So what will I accomplish during the second year ?  Well, I'm looking forward to finishing the helix and building the bench work Wesso Junction and Carlin sections.  I'm also looking forward to working with the code 55 track that will be used after the helix is done and of course starting some scenery.