In the Harney section of the layout the Humboldt River runs between the two tracks for about 4-1/2 feet. The river is relatively straight and I felt it was not very interesting. Also, at the end of this section near the high bridge the river bed needed to climb up about 1/2 inch.
So I recently created a little rapids area over the spot where the
level changes. I don't know if there is anything like this on the
prototype Humboldt River but it seems like a fun thing to have on a
layout.
Woodland Scenics water effects was used to give the water some texture in the right places and some of the ridges were highlighted with white paint applied with a toothpick. All of the water was then given a final coat of gloss medium.
No comments:
Post a Comment