Thursday, September 12, 2019

Lighting the next layout expansion

Since last post the LED light bulbs have been installed under the new shelf and a valance put in along the edge of the shelf and painted.  This extends all the way around to the door.
The bulbs were spaced every 18 inches and connected to the existing circuit.  The brightness and color seem to match the existing just right.

I purchased enough bulbs and sockets to also light the area where Carlin will be in the future.

No comments:

Post a Comment