Friday, November 6, 2015

The work train

After cleaning up the area around the helix which had gotten rather messy I am determined to be more organized in my work.

I decided to have some fun with it and made up a work train of gondolas and flat cars to bring some of  track laying materials and tools to within my reach then send it back down to the safety of the yard.




Work on the helix is moving along with a repeating  pattern of adding a section or two to the structure, then adding cork roadbed, and then the track.  Getting close to the height it needs to be.