Wednesday, August 26, 2015

Installing the staging yard


Since my last post about a week ago, I got the staging yard permanently installed in the layout. Prior to installing the yard, I removed the display case and the support brackets for the upper deck so I could spray paint the brackets white.

The yard is secured to the walls and also is supported by two large sturdy support brackets.  A third bracket was planned but after the first two were in I decided a third was not needed.  Spacing is 48 inches between brackets.

Also did some paint touch ups on the wall in this area.

I prefer not to mount all the electronics under the bench work so I used a left over 2 ft square piece of 3/4 inch plywood to make a place for wall mounting of the circuits.  This is at the entry end of the yard and has a hinged Plexiglass door to protect everything.  More on this in a future post.

Thursday, August 20, 2015

Wiring the staging yard - Turnout controls

With double ended yards, turnouts can be controlled in pairs as long as there is sufficient power from the controller for it.  I am most likely going to use the Digitrax DS64 stationary decoder to control the routes and turnouts for this particular project and have tested it and know that it's output can handle it.

This drawing represents how the turnout motors are wired in pairs to the outputs of the stationary decoder.  Green squares represent Tortoise machines.  Pairs 2 and 3 will be wired to outputs 2 and 3 but were left off for clarity.


I used 22 gauge stranded wire for this part. A different color wire twisted with a black wire is used for each pair of turnouts.  I normally like to use Euro type terminal strips for my under layout wiring but as I had so many of the standard screw type in a box I decided to use these for the turnout control wiring.

This photo shows the terminal strip at the entry end of the yard with wires going off to each of the Tortoise motors. The extra screws will be for the entry turnout that forms the reverse loop.

The 22 gauge wire can either be tinned and bent around the screws or a lug can be crimped on, both ways are shown here.

This photo shows how I am  testing each pair with 10 volts from a DC power supply.

After the yard is installed, the connections to the controller will be made from this terminal strip.

If it is discovered during testing that one turnout of a pair is operating backwards, then it is easy to reverse the connections at that turnout as shown in this photo.

At this point all of the track and wiring that can be done with the module on it's edge are done and it's time to install it in it's place in the layout.

Sunday, August 16, 2015

Evolution of a control panel layout

Back in February in the post Staging yard control panels I was starting with the control panels for the staging yard.

I had reviewed some of the control panels that I had built in the past for various layouts and decided on using a paper behind acrylic design.  I had a general idea of what I wanted the control panels to do and had built two boxes to hold the control panel and some associated circuitry from scarps of 1/4 inch plywood as shown in this photo.



Since then I have defined more specifically what I want the control panels to do.

  • Select yard ladder turnout alignment at both ends with one switch
  • Select which track is active with the same switch
  • Indicate which track is aligned and active
  • Control the turnout at entry to yard which creates the reverse loop
  • Indicate position of that turnout at entry of yard.
  • Have provision to indicate occupancy on each track
  • Have provision to select some sort of automated mode.

On all of the drawings below the big dots represent toggle switches and the small ones represent small LED's.  In this post I am addressing control for the smaller of the two yards, the WP / UP on the upper level.

This is the most basic idea I had for the layout of the control panel for the WP / UP staging yard on the upper level.  This is very similar to what is shown in the first photo.



One problem I had with this panel layout was how to control and show the position of the first turnout at the entry the yard where the return route branches off.

Using momentary center off ON/OFF/ON type of toggle switches 8 routes could be selected, 4 with the entry turnout aligned and 4 with it closed.



LED's on each staging track indicate alignment of the yard ladder and a pair of LED's for the entry turnout show it's position.  A second set of LED's show occupancy for each staging track.

This final version is a more accurate representation of the actual track plan.  The positions of the toggle switches is offset to make access easier.


A spot for a Manual / Auto switch is added for future automation plans.

Here's the finished control panel for the WP/UP staging yard.  The boxes have been spray painted with Rust-Oleum smoke gray.

I still need to finish the panel for the SP yard and wire both of them into the yard.

Sunday, August 9, 2015

Wiring the staging yard - Track feeders

With the last of the track and turnouts installed and tested on the staging yard module, it was time to finish the wiring.  I know lots of modelers hate wiring but I actually enjoy it.  Even with DCC, there is still a lot of wiring.  The wiring on most of this layout will be relativity simple but this staging yard has the highest concentration of it.

I have found those isolation plates I made to be a great place to connect the feeder wires to.  Almost all of the feeders needed were connected to one of these.

The feeders for the turnout frogs were soldered to the tie that passes through the center of the frog.
After the PC ties and isolation plates were painted weathered black, the feeder wires which are pointed out with yellow arrows in this photo are hardly noticeable.

An advantage of building the bulk of the yard as a module is that most of the wiring can be completed with it standing on edge.  I use saw horses with a 2 ft wide scrap of plywood and clamp the module frame to plywood for stability as shown in this photo.  The plywood gives me a place to put the tools and I can even do the work from a chair and be comfortable.


Although I am using DCC and may someday learn to use some sort of more sophisticated JMRI type of computer control to route trains or do some automation I'm not there yet.  So I am keeping my options open and have each yard siding isolated from the main line.  I have installed 22 gauge feeders to both ends of each siding and to each isolated section of rail in the yard ladders,  that's a lot of feeders.

I try to use the same color wires for each type of connection.  In this photo, the sidings have either red, yellow, green, or blue wire or wire markings.  White was used for the frog feeders.

It takes a bit of discipline but pays off with easier trouble shooting or modifications later.

Thursday, August 6, 2015

Mid-Summer progress report

It's been almost a month since I posted anything on this blog so just a quick update to let everyone know I'm still active on this layout.  While I've been busy with other things, I have been able to do a little bit more work on the staging yard and am getting close to having all the track work done.

Seen in this photo the entry end of the WP staging yard now has paint and cork and I've built up a 3 turnout yard ladder.

The project going on when I took this photo was to install the linkages between the turnouts and the Tortoise motors.  The Tortoises will be mounted upside down the way I did on the loop end of the SP yard.

Tuesday, July 7, 2015

Continuing progress on staging yard

Work has resumed on the upper section of the staging yard which will serve as the western terminus on the layout for the Western Pacific.

I have been building more Fast Tracks turnouts and put three right hand ones together to make the yard ladder shown in this photo.   Using the yard ladder as a guide, the cork road bed was completed to tie in the road bed from the yard tracks with that coming off the turn around loop bridge.

Also 6 more Tortoise turnout motors have been received and 3 of those will be used to power this yard ladder after the track is installed.
At the other end of the yard the section of the upper yard deck that had been left open has been completed by inserting a section of 1/2 inch plywood.

After this photo was taken the bare wood was painted both on the top and bottom to seal it.

Thursday, June 18, 2015

Helix design

When I decided that I would need a helix to do what I wanted to do on this layout I studied everything I could on the Internet and examined first hand any helix that I could.  The room that I built in the back of my garage is a 20 x 10 ft rectangle but has a 2 ft bump out in one corner for part of the helix.  The net space set aside for the helix is 42 x 42 inches.

I really liked the idea of using all thread rods to support the helix because it would allow me to experiment with some different grade adjustments plus it offered the best access to the tracks.

My design uses 90 degree curved sections of 1/2 inch plywood that are 4.5 inches wides.  The radius on the outer edge of the curved sections is 20.5 inches.  Between each section a pair of splicing blocks hold the sections together and attach to 3/8 inch all thread rod.  Two 8-32 screws on each side of each section will secure the splice blocks to the curved sections.

I found that I could get 10 of the curved sections from a 4 x 4 sheet of birch plywood.  After making the first one I marked it as master and used it as a template to draw the others.



The splicing blocks are made from scraps of the sheet that the curved sections were cut from in between 1/4 inch thick birch plywood material.  The overall size of these assemblies is 4 inches x 2 inches.

Here are the results from a single 4 x 4 sheet of plywood.  The curved sections on the left have been painted. All sections will be painted prior to assembly.  This is a start, my plan is by doing some of this now, I'll be able to go right into assembling the helix after the yard is completed and installed.

Wednesday, June 3, 2015

Removable bridge for the upper staging yard.

Besides the brass bridge that I built last November for the loop on the upper line to pass over the loop on the lower line, there was going to be another bridge needed to bring the front end of the loop back over the yard ladder of the lower yard.   This curved bridge was built of tempered hard board.  I thought that it would be great if the bridge could be made removable in case that yard ladder ever had to be worked on.

Here is the completed bridge installed.  The tempered hard board worked out really well in this off scene application where sturdiness was the most important feature needed.



Here is the bridge removed to access the lower yard ladder turnouts below.  It only takes a few minutes to remove or re-install the bridge.

Since I had been happy with the results of using small sections of PC board to make the rail gaps, I decided to try to use that to make solid ends for the track on the bridge and for the approaches to the bridge.

For more details on how I work with this material, see the post Staging yard track gaps.

In this photo one of the screws that hold the bridge in place can be seen.
As the section of track on this bridge is not mechanically connected to the main track, feeder wires soldered to the bridge track pass through a hole and connect to the main feeder.








At this point the road bed is in for most of the upper yard and enough track is in on the return line so that this bridge has been thoroughly tested.  Some more turnouts have been built and track laying in the upper yard can proceed soon..

Sunday, May 10, 2015

Modifying a work light with LED modules

I have one of those lighted magnifying glasses that is mounted on a folding arm to my work bench. This is the kind that has a circular fluorescent bulb with the magnifying glass in the middle and a push button to start.  The fluorescent bulb needed to be replaced, plus the starting circuit had been acting up for some time.  As there was nothing wrong mechanically with the lamp, I started to think about how it could be converted to LED's.

First step was to remove the fluorescent bulb and the clips that hold it in place.

Well actually, the very first step was to UNPLUG the lamp from the wall.

The push button switch was also removed and Anderson Power pole connectors were installed on the wires that were left.

I made a ring from a scrap of Masonite that fit right in where the fluorescent bulb had been. The ring was spray painted glossy white so it would be more reflective.

The ring was able to accommodate 7 of the LED modules that I have been using for the layout lighting.  A small block of wood was attached to have a handle to remove the assembly from the lamp.

Here is the back side the the ring assembly.

Magnets were attached to the back side with adhesive and all of the lighting modules were wired in parallel with an Anderson Power pole connector at the end of the chain.


Here is the completed ring installed in the lamp.  The magnets are strong so just the two of them hold it in place.  The handle was first put on to help remove the ring but it was also helpful in getting the ring into the right position.

The base of the lamp had a small box that contained the ballast transformer and this is where the AC cord connected.

I removed the AC cord and transformer, then connected the output of one of the power supplies that are being used for the layout lighting.  It's a bit of an over kill for the 7 modules.  The power supply was then mounted to the base of the lamp with adhesive.

The push button that had been removed was replaced with a simple ON / OFF toggle switch.

As can be seen in this photo the 7 LED modules provide plenty of light, I would say at least as much as the fluorescent bulb did.

In this view I think it looks a bit like an alien space ship.